Wednesday, October 12, 2011

The Tiling

An early call with the door bell going at 745 (yes it now works!) and it was Chris from Direct Kitchens to finish the kick board of the dishwasher. He also noted that the stove was set below the level of the bench (the closed  lid was level) but it would mean that heat/flame would be on edge of the bench, so he fixed that, also fixed a drawer that was slightly sticking and gave me the accurate measurements for the window architrave.


the little tgs go when the grouting goes in!
Quinton then got the tiling going and did a good job to balance the tiles, as the detail tile is smaller than the other. But I am very happy with the result. As glass tiles absorb moisture more slowly he will leave the grouting till they have adhered and will be back Friday for a last hour's work.
All the stuff is now back in the kitchen and we no longer look like a garage sale.
Last thing the painting!!

1 comment:

see me said...

Looks great Mich. I love the golden reflection of the ceiling on the rangehood!
Almost done eh!? Thank you :)

India and after

 I've been unable to post all year ( not that 2020 has been a year of activity) and because the the action bar at the top of the blog di...